Heat recovery ventilation (MVHR) in Billingham
A free survey, a clear specification and a fixed price for heat recovery ventilation in Billingham.
- Free site survey and fixed written quote
- Equipment, positions and price set out in writing
- Work planned around your opening hours
How much does heat recovery ventilation cost in Billingham?
Budget roughly £4,650–£18,350 per unit installed ex VAT in Billingham. For a typical job — heat recovery for a 100–200 m² office — expect £6,550–£13,650 plus VAT. The fixed price follows a free survey.
Heat recovery ventilation (MVHR) supplies fresh air and extracts stale air through a unit with a heat exchanger, which transfers much of the heat from the outgoing air to the incoming air.
Our coverage in Billingham
Businesses in Billingham range from independent shops and restaurants to offices, clinics and warehouses. Middlesbrough is about 4 km away.
Postcode districts we cover in Billingham include TS23. Neighbouring towns we cover include Stockton-on-Tees, Middlesbrough and Yarm. Heat recovery ventilation in Billingham is priced from a written specification that lists the equipment, positions, controls and commissioning.
What we do
- Fresh-air rate and unit sizing
- Heat recovery unit with filters and summer bypass
- Supply and extract ductwork and grilles
- Intake and exhaust terminals
- Controls with CO2 or time control
Heat recovery ventilation prices in Billingham
Guide prices for Billingham, set for the North East. Your fixed price comes in writing.
| Item | Guide price (ex VAT) | Inc VAT | Basis |
|---|---|---|---|
| Ceiling-void heat recovery unit (small) | £4,650–£8,395 | £5,580–£10,074 | per unit |
| Floor-standing or roof unit (medium) | £8,395–£18,350 | £10,074–£22,020 | per unit |
| Filter change | £90–£230 | £108–£276 | per unit |
| Annual service | £185–£370 | £222–£444 | per unit |
Ex VAT, supply and install including standard ductwork.
How a job in Billingham works
Calculate
Fresh-air needs are calculated per room.
Select
A unit is chosen for air flow, efficiency and space.
Install
Unit, ductwork, terminals and controls are fitted. In Billingham we agree timings around your opening hours.
Balance
Supply and extract air flows are balanced and commissioned.
What to think about in Billingham
Summer bypass
A bypass avoids warming incoming air in summer.
Shared buildings
In multi-let buildings, roof space, risers and plant areas are often controlled by a managing agent. We work to their permits and method-statement requirements.
Integration
Heat recovery pairs well with air conditioning, which handles the room heating and cooling.
Roof and height work
Flat roofs, high walls and atriums need the right access equipment and edge protection. We plan towers, MEWPs or scaffold before the job, not on the day.
Types of premises we cover in Billingham
- Schools and education: classroom cooling, ventilation and IT room cooling, installed in the holidays.
- Hotels and hospitality: quiet bedroom units, public-area cooling and heat recovery for hotels.
- Gyms and leisure: high-capacity cooling and fresh air for gym floors, studios and changing rooms.
In England, systems holding 5 tonnes CO2 equivalent of refrigerant or more fall under GB F-gas rules, with regular leak checks and records; buildings with more than 12 kW of air conditioning in total also need a periodic energy inspection.
Common questions from businesses in Billingham
How much does heat recovery ventilation cost in Billingham?
Guide prices in Billingham run from about £4,650 to £18,350 per unit installed, plus VAT. A typical job (heat recovery for a 100–200 m² office) costs £6,550–£13,650 plus VAT. We fix the price in writing after a free survey.
Do you also cover Stockton-on-Tees, Middlesbrough and Yarm?
Yes. Alongside Billingham, we also cover Stockton-on-Tees, Middlesbrough and Yarm. Each has its own page with local guide prices.
Which postcodes do you cover in Billingham?
All of them, including TS23. Give us your postcode when you enquire and we will confirm the visit details.
How often do filters need changing?
Typically every three to six months, depending on the location and filter grade.
Does MVHR cool a building?
Not really. It moderates incoming air temperature and has a summer bypass, but cooling comes from air conditioning.
Get a guide price for Billingham
Free survey and fixed written quote. We reply with a guide price or to book the survey.