Heat recovery ventilation (MVHR) in Bridgend
A free survey, a clear specification and a fixed price for heat recovery ventilation in Bridgend.
- Free site survey and fixed written quote
- Equipment, positions and price set out in writing
- Work planned around your opening hours
How much does heat recovery ventilation cost in Bridgend?
In Bridgend, guide prices run from about £4,695 to £18,500 per unit installed, plus VAT. A typical job (heat recovery for a 100–200 m² office) usually comes to £6,595–£13,795 plus VAT. You get a fixed written quote after the free survey.
Heat recovery ventilation (MVHR) supplies fresh air and extracts stale air through a unit with a heat exchanger, which transfers much of the heat from the outgoing air to the incoming air.
Working in Bridgend
Bridgend has a compact centre of shops, cafés and offices, with business units on its outskirts. Cardiff is about 28 km away.
That includes premises in CF31 and the surrounding districts. Neighbouring towns we cover include Porthcawl, Llantwit Major and Maesteg. We plan work in Bridgend so the noisy parts happen when they disturb your business least.
Included as standard
- Fresh-air rate and unit sizing
- Heat recovery unit with filters and summer bypass
- Intake and exhaust terminals
- Controls with CO2 or time control
- Balancing and commissioning
Guide prices in Bridgend
Guide prices for Bridgend, set for Wales. Your fixed price comes in writing.
| Item | Guide price (ex VAT) | Inc VAT | Basis |
|---|---|---|---|
| Ceiling-void heat recovery unit (small) | £4,695–£8,500 | £5,634–£10,200 | per unit |
| Floor-standing or roof unit (medium) | £8,500–£18,500 | £10,200–£22,200 | per unit |
| Filter change | £90–£235 | £108–£282 | per unit |
| Annual service | £185–£375 | £222–£450 | per unit |
Ex VAT, supply and install including standard ductwork.
From enquiry to handover in Bridgend
Calculate
Fresh-air needs are calculated per room.
Select
A unit is chosen for air flow, efficiency and space.
Install
Unit, ductwork, terminals and controls are fitted. In Bridgend we agree timings around your opening hours.
Balance
Supply and extract air flows are balanced and commissioned.
Before you book in Bridgend
Space
Units need space in the ceiling void or a plant area with access for filter changes.
Roof and height work
Flat roofs, high walls and atriums need the right access equipment and edge protection. We plan towers, MEWPs or scaffold before the job, not on the day.
Integration
Heat recovery pairs well with air conditioning, which handles the room heating and cooling.
Neighbours and noise
Outdoor units near flats — common above shops — need careful siting so noise at neighbours' windows stays low. We choose positions and quieter units with that in mind.
Who we work with in Bridgend
- Gyms and leisure: high-capacity cooling and fresh air for gym floors, studios and changing rooms.
- Schools and education: classroom cooling, ventilation and IT room cooling, installed in the holidays.
- Hotels and hospitality: quiet bedroom units, public-area cooling and heat recovery for hotels.
Compliance in Wales: refrigerant work falls under GB F-gas rules, and buildings with more than 12 kW of air conditioning in total need a periodic energy inspection (often called TM44).
FAQs for Bridgend
How much does heat recovery ventilation cost in Bridgend?
Guide prices in Bridgend run from about £4,695 to £18,500 per unit installed, plus VAT. A typical job (heat recovery for a 100–200 m² office) costs £6,595–£13,795 plus VAT. We fix the price in writing after a free survey.
Do you also cover Porthcawl, Llantwit Major and Maesteg?
Yes. Alongside Bridgend, we also cover Porthcawl, Llantwit Major and Maesteg. Each has its own page with local guide prices.
Which postcodes do you cover in Bridgend?
All of them, including CF31. Give us your postcode when you enquire and we will confirm the visit details.
How efficient is heat recovery ventilation?
Commercial units commonly recover the majority of the heat in the extract air, depending on the unit type and conditions. We give the figures for the unit we propose.
How often do filters need changing?
Typically every three to six months, depending on the location and filter grade.
Get a guide price for Bridgend
Free survey and fixed written quote. We reply with a guide price or to book the survey.