Heat recovery ventilation (MVHR) in High Wycombe
A free survey, a clear specification and a fixed price for heat recovery ventilation in High Wycombe.
- Free site survey and fixed written quote
- Equipment, positions and price set out in writing
- Work planned around your opening hours
How much does heat recovery ventilation cost in High Wycombe?
Our guide range in High Wycombe is £5,695–£22,500 per unit installed before VAT; a typical job (heat recovery for a 100–200 m² office) is £7,995–£16,695 plus VAT. Your exact price is fixed in writing once we have surveyed.
Heat recovery ventilation (MVHR) supplies fresh air and extracts stale air through a unit with a heat exchanger, which transfers much of the heat from the outgoing air to the incoming air.
Working in High Wycombe
High Wycombe supports a mix of high-street retail, professional offices, hospitality and light industry. Slough is about 17 km away.
We work across High Wycombe's postcode districts, including HP13. Neighbouring towns we cover include Marlow, Amersham and Maidenhead. For heat recovery ventilation in High Wycombe, the survey looks at how the space is used, where equipment and ductwork can go and what the electrical supply can take.
Included as standard
- Fresh-air rate and unit sizing
- Heat recovery unit with filters and summer bypass
- Supply and extract ductwork and grilles
- Intake and exhaust terminals
- Balancing and commissioning
Guide prices in High Wycombe
Guide prices for High Wycombe, set for the South East. Your fixed price comes in writing.
| Item | Guide price (ex VAT) | Inc VAT | Basis |
|---|---|---|---|
| Ceiling-void heat recovery unit (small) | £5,695–£10,295 | £6,834–£12,354 | per unit |
| Floor-standing or roof unit (medium) | £10,295–£22,500 | £12,354–£27,000 | per unit |
| Filter change | £110–£280 | £132–£336 | per unit |
| Annual service | £225–£455 | £270–£546 | per unit |
Ex VAT, supply and install including standard ductwork.
From enquiry to handover in High Wycombe
Calculate
Fresh-air needs are calculated per room. For sites in High Wycombe we confirm access and parking beforehand.
Select
A unit is chosen for air flow, efficiency and space.
Install
Unit, ductwork, terminals and controls are fitted.
Balance
Supply and extract air flows are balanced and commissioned.
Things to check in High Wycombe
Filters
Filters must be changed regularly to keep air flow and air quality up.
Conservation areas
Historic streets and listed buildings in and around High Wycombe are more likely to need planning permission for outdoor units on visible elevations. We check with the local planning authority before work is booked.
Integration
Heat recovery pairs well with air conditioning, which handles the room heating and cooling.
Access and parking
Town-centre jobs in High Wycombe often come down to access — loading restrictions, parking for the van and getting equipment onto a roof. We check this at survey and plan deliveries around it.
Types of premises we cover in High Wycombe
- Schools and education: classroom cooling, ventilation and IT room cooling, installed in the holidays.
- Gyms and leisure: high-capacity cooling and fresh air for gym floors, studios and changing rooms.
- Hotels and hospitality: quiet bedroom units, public-area cooling and heat recovery for hotels.
In England, systems holding 5 tonnes CO2 equivalent of refrigerant or more fall under GB F-gas rules, with regular leak checks and records; buildings with more than 12 kW of air conditioning in total also need a periodic energy inspection.
FAQs for High Wycombe
How much does heat recovery ventilation cost in High Wycombe?
Guide prices in High Wycombe run from about £5,695 to £22,500 per unit installed, plus VAT. A typical job (heat recovery for a 100–200 m² office) costs £7,995–£16,695 plus VAT. We fix the price in writing after a free survey.
Do you also cover Marlow, Amersham and Maidenhead?
Yes. Alongside High Wycombe, we also cover Marlow, Amersham and Maidenhead. Each has its own page with local guide prices.
Which postcodes do you cover in High Wycombe?
All of them, including HP13. Give us your postcode when you enquire and we will confirm the visit details.
How often do filters need changing?
Typically every three to six months, depending on the location and filter grade.
How efficient is heat recovery ventilation?
Commercial units commonly recover the majority of the heat in the extract air, depending on the unit type and conditions. We give the figures for the unit we propose.
Talk to us about your premises in High Wycombe
Free survey and fixed written quote. We reply with a guide price or to book the survey.