TM44 air conditioning inspections in Stirling
Stay compliant in Stirling: TM44 air conditioning inspections arranged, recorded and followed up.
- Price confirmed before booking
- Every system listed and checked
- Records you can show an inspector
How much does a TM44 inspection cost in Stirling?
In Stirling, guide prices are about £380–£2,850 per building, plus VAT. A typical job (office or shop with 15–50 kW of air conditioning) is £380–£765 plus VAT. The price is confirmed before booking.
A TM44 inspection is the air conditioning energy assessment required for systems with a combined effective rated output above 12 kW.
Our coverage in Stirling
In Stirling, typical premises are high-street shops, offices above them, surgeries, salons and local industrial units. Glasgow is about 34 km away.
That includes premises in AB42 and FK8 and the surrounding districts. We also work in nearby Alloa, Falkirk and Grangemouth. We give you the records in a form an inspector, insurer or landlord can read, and remind you when the next check is due.
Included as standard
- Collection of system details, records and drawings
- Inspection arranged with an accredited air conditioning energy assessor
- Report with recommendations, lodged where the rules require
- Quote for any recommended improvements
- Reminder before the next inspection is due
Local guide prices for Stirling
These guide prices are adjusted for Scotland, where labour and access costs run about 4% below the UK guide.
| Item | Guide price (ex VAT) | Inc VAT | Basis |
|---|---|---|---|
| Small building, up to about 50 kW | £380–£765 | £456–£918 | per inspection |
| Medium building, 50–250 kW | £665–£1,395 | £798–£1,674 | per inspection |
| Large or complex building | £1,195–£2,850 | £1,434–£3,420 | per inspection |
Ex VAT. Final price depends on the number and type of systems and site access.
How we handle TM44 inspections in Stirling
Check the threshold
We work out the effective rated output of the systems you control and whether they count together under the rules for your nation.
Prepare
Make, model, capacity, refrigerant and maintenance records are gathered for the assessor.
Inspect
The accredited assessor inspects the systems and controls on site.
Act on the report
You receive the report; we can quote for the recommended improvements.
Local points to consider
Scotland
Regulation 17 of the Building (Scotland) Regulations requires inspection of systems with an effective output of 12 kW or more by an accredited expert, typically every three to five years depending on condition.
Access and parking
Town-centre jobs in Stirling often come down to access — loading restrictions, parking for the van and getting equipment onto a roof. We check this at survey and plan deliveries around it.
Not an F-gas check
A TM44 inspection is about energy efficiency. It does not replace F-gas leak checks or servicing.
Conservation areas
Historic streets and listed buildings in and around Stirling are more likely to need planning permission for outdoor units on visible elevations. We check with the local planning authority before work is booked.
Premises we work in around Stirling
- Schools and education: classroom cooling, ventilation and IT room cooling, installed in the holidays.
Compliance in Scotland: refrigerant work falls under GB F-gas rules, and systems with an effective output of 12 kW or more need a periodic energy inspection (often called TM44).
Common questions from businesses in Stirling
How much does a TM44 inspection cost in Stirling?
In Stirling, guide prices are around £380–£2,850 per building, plus VAT; a typical job (office or shop with 15–50 kW of air conditioning) is £380–£765 plus VAT.
Do you also cover Alloa, Falkirk and Grangemouth?
Yes. Alongside Stirling, we also cover Alloa, Falkirk and Grangemouth. Each has its own page with local guide prices.
Which postcodes do you cover in Stirling?
All of them, including AB42 and FK8. Give us your postcode when you enquire and we will confirm the visit details.
Do I need a TM44 inspection?
In England, Wales and Northern Ireland, yes if the air conditioning you control in a building adds up to more than 12 kW of effective rated output, at least every five years. In Scotland, systems of 12 kW or more need inspecting (separate units count together only where centrally controlled), at intervals set by the accredited expert.
Is a TM44 the same as an EPC?
No. An EPC rates the whole building's energy performance. A TM44 is a separate inspection of the air conditioning systems.
Talk to us about your premises in Stirling
The visit price is agreed before we book. We reply with a guide price or available dates.