Heat recovery ventilation (MVHR) in Nailsea
Heat recovery ventilation for businesses in Nailsea — surveyed, designed and priced in writing before any work starts.
- Free site survey and fixed written quote
- Equipment, positions and price set out in writing
- Work planned around your opening hours
How much does heat recovery ventilation cost in Nailsea?
Our guide range in Nailsea is £5,150–£20,500 per unit installed before VAT; a typical job (heat recovery for a 100–200 m² office) is £7,250–£15,095 plus VAT. The fixed price follows a free survey.
Heat recovery ventilation (MVHR) supplies fresh air and extracts stale air through a unit with a heat exchanger, which transfers much of the heat from the outgoing air to the incoming air.
Covering Nailsea and nearby
In a town like Nailsea, a single wall unit for a shop or a cassette for a surgery makes a real difference in summer. Bristol is about 12 km away.
That includes premises in BS20, BS21 and BS48 and the surrounding districts. Neighbouring towns we cover include Portishead, Clevedon and Weston-super-Mare. For heat recovery ventilation in Nailsea, the survey looks at how the space is used, where equipment and ductwork can go and what the electrical supply can take.
What the job covers
- Fresh-air rate and unit sizing
- Heat recovery unit with filters and summer bypass
- Intake and exhaust terminals
- Controls with CO2 or time control
- Balancing and commissioning
Guide prices in Nailsea
Guide prices for Nailsea, set for the South West. Your fixed price comes in writing.
| Item | Guide price (ex VAT) | Inc VAT | Basis |
|---|---|---|---|
| Ceiling-void heat recovery unit (small) | £5,150–£9,295 | £6,180–£11,154 | per unit |
| Floor-standing or roof unit (medium) | £9,295–£20,500 | £11,154–£24,600 | per unit |
| Filter change | £100–£255 | £120–£306 | per unit |
| Annual service | £205–£410 | £246–£492 | per unit |
Ex VAT, supply and install including standard ductwork.
From enquiry to handover in Nailsea
Calculate
Fresh-air needs are calculated per room. For sites in Nailsea we confirm access and parking beforehand.
Select
A unit is chosen for air flow, efficiency and space.
Install
Unit, ductwork, terminals and controls are fitted.
Balance
Supply and extract air flows are balanced and commissioned.
Things to check in Nailsea
Filters
Filters must be changed regularly to keep air flow and air quality up.
Neighbours and noise
Outdoor units near flats — common above shops — need careful siting so noise at neighbours' windows stays low. We choose positions and quieter units with that in mind.
Summer bypass
A bypass avoids warming incoming air in summer.
Shared buildings
In multi-let buildings, roof space, risers and plant areas are often controlled by a managing agent. We work to their permits and method-statement requirements.
Premises we work in around Nailsea
- Hotels and hospitality: quiet bedroom units, public-area cooling and heat recovery for hotels.
- Schools and education: classroom cooling, ventilation and IT room cooling, installed in the holidays.
- Gyms and leisure: high-capacity cooling and fresh air for gym floors, studios and changing rooms.
In England, systems holding 5 tonnes CO2 equivalent of refrigerant or more fall under GB F-gas rules, with regular leak checks and records; buildings with more than 12 kW of air conditioning in total also need a periodic energy inspection.
Your questions answered
How much does heat recovery ventilation cost in Nailsea?
Guide prices in Nailsea run from about £5,150 to £20,500 per unit installed, plus VAT. A typical job (heat recovery for a 100–200 m² office) costs £7,250–£15,095 plus VAT. We fix the price in writing after a free survey.
Do you also cover Portishead, Clevedon and Weston-super-Mare?
Yes. Alongside Nailsea, we also cover Portishead, Clevedon and Weston-super-Mare. Each has its own page with local guide prices.
Which postcodes do you cover in Nailsea?
All of them, including BS20, BS21 and BS48. Give us your postcode when you enquire and we will confirm the visit details.
How efficient is heat recovery ventilation?
Commercial units commonly recover the majority of the heat in the extract air, depending on the unit type and conditions. We give the figures for the unit we propose.
How often do filters need changing?
Typically every three to six months, depending on the location and filter grade.
Talk to us about your premises in Nailsea
Free survey and fixed written quote. We reply with a guide price or to book the survey.