0800 088 6248
Engineer marking up mechanical ductwork drawings beside a laptop showing a 3D building model

HVAC design and heat load surveys in Orkney, Shetland and the Western Isles

HVAC design and heat load surveys for businesses in Orkney, Shetland and the Western Isles — surveyed, designed and priced in writing before any work starts.

  • Survey by arrangement, travel charge quoted first
  • Equipment, positions and price set out in writing
  • Work planned around your opening hours

How much does HVAC design cost in Orkney, Shetland and the Western Isles?

Our guide range in Orkney, Shetland and the Western Isles is £520–£2,550 per project before VAT; a typical job (design package for a 300–800 m² office) is £1,050–£2,550 plus VAT. For remote and island locations, a travel charge (ferry fares and any accommodation at cost, plus travel time) is quoted as a fixed amount in writing before anything is booked.

An HVAC design and heat load survey works out how much heating and cooling each space needs — from occupancy, equipment, lighting, glazing, orientation and the building fabric — and sets out the system type, unit sizes and positions, pipe and duct routes and controls in a written specification.

Orkney, Shetland and the Western Isles and surrounding areas

We cover Orkney, Shetland and the Western Isles by arrangement, including Stornoway, Kirkwall and Lerwick. Wherever your premises are, the survey, quote and installation follow the same steps.

Postcode districts we cover include HS1, HS3, HS5, HS7, HS9, KW16, ZE1 and ZE3. We plan work in Orkney, Shetland and the Western Isles so the noisy parts happen when they disturb your business least.

We cover Orkney, Shetland and the Western Isles by arrangement: a travel charge (ferry fares and any accommodation at cost, plus travel time) is quoted as a fixed amount in writing before anything is booked. We group visits where we can to keep it down.

Included as standard

  • Room-by-room heat gain and heat loss calculations
  • System options with pros, cons and budget costs
  • Electrical load and supply requirements
  • Noise data for planning or landlord approval
  • Written specification for pricing

Prices in Orkney, Shetland and the Western Isles

Guide prices for Orkney, Shetland and the Western Isles, set for the north of Scotland. Your fixed price comes in writing.

HVAC design guide prices, Orkney, Shetland and the Western Isles
ItemGuide price (ex VAT)Inc VATBasis
Heat load survey for a single installationFree, plus travelFree, plus travelfree with a quote
Design package, small premises£520–£1,050£624–£1,260per project
Design package, larger premises£1,050–£2,550£1,260–£3,060per project
Noise assessment data pack for planning£310–£940£372–£1,128per project

Ex VAT. Design fees for larger projects are credited against installation if we carry it out.

How we work in Orkney, Shetland and the Western Isles

  1. Brief

    We agree the use, occupancy, hours and budget.

  2. Survey

    We measure the space and record fabric, glazing and services.

  3. Calculate and design

    Loads are calculated and a system designed. We keep work areas in Orkney, Shetland and the Western Isles screened and tidy at the end of each day.

  4. Specify

    You receive drawings and a specification.

Local points to consider

Coordination

Ceiling, lighting, sprinkler and electrical layouts are coordinated early.

Roof and height work

Flat roofs, high walls and atriums need the right access equipment and edge protection. We plan towers, MEWPs or scaffold before the job, not on the day.

Future use

Allow for growth in occupancy or IT load.

Shared buildings

In multi-let buildings, roof space, risers and plant areas are often controlled by a managing agent. We work to their permits and method-statement requirements.

Who we work with in Orkney, Shetland and the Western Isles

  • Salons and spas: comfortable salons and treatment rooms despite dryers, lamps and steam.
  • Retail and shops: comfortable shop floors, stockrooms and entrances, even with the door open.
  • Healthcare and dental: clean, quiet cooling for surgeries, clinics, dental practices and care settings.
  • Offices: zoned cooling and heating for open-plan floors, meeting rooms and comms rooms.

In Scotland, systems holding 5 tonnes CO2 equivalent of refrigerant or more fall under GB F-gas rules, with regular leak checks and records; systems with an effective output of 12 kW or more also need a periodic energy inspection.

Questions about HVAC design in Orkney, Shetland and the Western Isles

How much does HVAC design cost in Orkney, Shetland and the Western Isles?

Guide prices in Orkney, Shetland and the Western Isles run from about £520 to £2,550 per project, plus VAT. A typical job (design package for a 300–800 m² office) costs £1,050–£2,550 plus VAT. For Orkney, Shetland and the Western Isles, a travel charge is added and quoted in writing before the survey is booked.

Do you also cover Highland and Argyll and Bute?

Yes. Alongside Orkney, Shetland and the Western Isles, we also cover Highland and Argyll and Bute. Each has its own page with local guide prices.

Why do I need a heat load calculation?

It sizes the system to what the room actually needs, avoiding oversized equipment that wastes money and undersized equipment that cannot cope.

Do you provide noise data for planning?

Yes. We can supply manufacturer noise data and calculations to support a planning application.

Need HVAC design and heat load surveys in Orkney, Shetland and the Western Isles?

Visits to Orkney, Shetland and the Western Isles are by arrangement: a travel charge (ferry fares and any accommodation at cost, plus travel time) is quoted as a fixed amount in writing before anything is booked.

CallGet a quote